Onehunga trains cleared to resume after truck hits underpass at Ellerslie
NZ Herald
2 mins to read
Subscribe to listen
Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Save Trains have been stopped after a truck hit the roof in the Mitchelson St underpass at Ellerslie. Photo / Michael Craig
Trains on Auckland's Onehunga line have been cleared to resume after a truck hit an underpass under the railway line at Ellerslie.
A police spokeswoman said the truck hit the roof of the underpass in Mitchelson St at 8.40am today Sunday.
Auckland Transport spokesman Mark Hannan said trains on the
Onehunga line were cancelled between Britomart and Penrose in both directions.
A rail shuttle operated between Penrose and Onehunga in both directions.