"The council is working closely with insurers as these evaluations progress, and while our engineers have indicated their recommendations for some of the buildings involved, decisions on the future of the facilities are still some months away."
AMI Stadium
# Engineers recommend the Hadlee Stand is demolished.
# Re-levelling and other repairs are required on the Tui Stand at the southern end of the stadium.
# More work is required to establish the best outcomes for the Paul Kelly Stand and the Deans Stand. Both have dropped around 300-400mm as a result of the earthquakes.
# Assessments on what is required to repair the turf and associated stormwater and irrigation are ongoing.
Christchurch Convention Centre
Council engineers believe the Christchurch Convention Centre has suffered so much damage it should be demolished. The outcome for the building has not yet been settled with insurers but discussions are progressing and an agreement expected soon.
Christchurch Town Hall for the Performing Arts
The main damage to the Town Hall has been caused by land movement rather than structural problems as a result of shaking during the earthquake. The ground has settled and lateral spread has shifted the foundations of the building, with some parts of the building moving 150mm toward the river. The level of the floor in the auditorium now varies by up to 450mm.
Assessments into what is required to repair the building are ongoing, with outcomes expected in November this year.
- HERALD ONLINE