Contractors have stabilised the slip around the Wairoa Bridge on State Highway 2 caused by last week’s weather system.
Tauranga was doused with 147mm of rain, well above its monthly average of 98mm, as the sub-tropical storm passed over the country on Thursday and Friday.
The Wairoa Bridge slip