The Country
  • The Country home
  • Latest news
  • Audio & podcasts
  • Opinion
  • Dairy farming
  • Sheep & beef farming
  • Rural business
  • Rural technology
  • Rural life
  • Listen on iHeart radio

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • Coast & Country News
  • Opinion
  • Dairy farming
  • Sheep & beef farming
  • Horticulture
  • Animal health
  • Rural business
  • Rural technology
  • Rural life

Media

  • Podcasts
  • Video

Weather

  • Kaitaia
  • Whāngarei
  • Dargaville
  • Auckland
  • Thames
  • Tauranga
  • Hamilton
  • Whakatāne
  • Rotorua
  • Tokoroa
  • Te Kuiti
  • Taumurunui
  • Taupō
  • Gisborne
  • New Plymouth
  • Napier
  • Hastings
  • Dannevirke
  • Whanganui
  • Palmerston North
  • Levin
  • Paraparaumu
  • Masterton
  • Wellington
  • Motueka
  • Nelson
  • Blenheim
  • Westport
  • Reefton
  • Kaikōura
  • Greymouth
  • Hokitika
  • Christchurch
  • Ashburton
  • Timaru
  • Wānaka
  • Oamaru
  • Queenstown
  • Dunedin
  • Gore
  • Invercargill

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / The Country

Slip on Whangarei stormwater holding dam shored up

Northern Advocate
27 Jun, 2017 11:00 PM2 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save
    Share this article
A slip on the upstream bank of the Maunu stormwater detention dam has cost $80,000 to fix. Photo/John Stone

A slip on the upstream bank of the Maunu stormwater detention dam has cost $80,000 to fix. Photo/John Stone

Work should be completed today on shoring up a slip near the inlet channel of the Maunu stormwater detention dam.

About 450sq m of rain soaked loose ground and trees 50 metres upstream slipped in May.

While it did not affect the dam's structure, engineers recommended the repair to stop material washing into the inlet channel and impeding the release of water, Northland Regional Council (NRC) Environmental Services general manager Bruce Howse said.

The repair bill has added $80,000 to the $11 million cost of the dam, being footed by 17,000 Northland Regional ratepayers with properties in the downstream area that now benefits from flood protection.

The repair bill will extend the 20-year term repayment by three months, based on no variations to future costs and revenue estimates.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

The 18m-high dam, capable of holding up to 1.27 million cubic metres of floodwater, was opened a year ago and is the largest project of its kind undertaken by the NRC.

Officially called Hopua te Nihotetea, most of the time it will hold no water but will come into its own in a large storm. It works by slowly releasing trapped stormwater over a couple of days, reducing downstream flood swelling by at least half a metre.

The dam will not completely stop floodwater from affecting the CBD as the Waiarohia Stream and tidal Hatea River also flow into the area, but it will slow the flow down the Raumanga Stream and other tributaries.

Advertisement
Advertise with NZME.
Save
    Share this article

Latest from The Country

The Country

New initiative to address training barriers for rural and Pacific workers

23 Sep 04:00 AM
The Country

How this forestry boss helped change the future for NZ falcons

23 Sep 03:29 AM
The Country

The Country: Farming, footy and the Bledisloe Cup

23 Sep 02:23 AM

Sponsored

Poor sight leaving kids vulnerable

22 Sep 01:23 AM
Advertisement
Advertise with NZME.

Latest from The Country

New initiative to address training barriers for rural and Pacific workers
The Country

New initiative to address training barriers for rural and Pacific workers

Project Fetu is launched as primary industry manufacturers in regional areas downsize.

23 Sep 04:00 AM
How this forestry boss helped change the future for NZ falcons
The Country

How this forestry boss helped change the future for NZ falcons

23 Sep 03:29 AM
The Country: Farming, footy and the Bledisloe Cup
The Country

The Country: Farming, footy and the Bledisloe Cup

23 Sep 02:23 AM


Poor sight leaving kids vulnerable
Sponsored

Poor sight leaving kids vulnerable

22 Sep 01:23 AM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • NZ Herald e-editions
  • Daily puzzles & quizzes
  • Manage your digital subscription
  • Manage your print subscription
  • Subscribe to the NZ Herald newspaper
  • Subscribe to Herald Premium
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2025 NZME Publishing Limited
TOP