Whanganui Chronicle
  • Whanganui Chronicle home
  • Latest news
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology

Locations

  • Taranaki
  • National Park
  • Whakapapa
  • Ohakune
  • Raetihi
  • Taihape
  • Marton
  • Feilding
  • Palmerston North

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • New Plymouth
  • Whanganui
  • Palmertson North
  • Levin

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Whanganui Chronicle

Opera House fix starts at top

By John Maslin
Whanganui Chronicle·
11 Jun, 2015 06:42 PM2 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

AERIAL ROUTE: Workmen cut holes in the Opera House roof so cranes could manoeuvre steel beams into the building yesterday.PHOTO/ STUART MUNRO 110615WCSMLIFT1

AERIAL ROUTE: Workmen cut holes in the Opera House roof so cranes could manoeuvre steel beams into the building yesterday.PHOTO/ STUART MUNRO 110615WCSMLIFT1

Like threading a needle, workmen carried out one of the most challenging jobs in the contract to strengthen the Royal Wanganui Opera House yesterday.

The historic building is the first of the city's public buildings to be brought up to earthquake strength and one of the keystones of the upgrade involved getting three 1.5-tonne steel beams into the Opera House.

The beams will create a new frame around the arch above the Opera House stage and will become a cornerstone for much of the earthquake strengthening.

Rick Grobecker, Wanganui District Council engineer and project manager, said the delicate work done yesterday was a "mini milestone".

The job involved cutting two holes in the Opera House roof, before two 14m upright beams were lowered inside using two cranes.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

Putting the 13m cross member in place was trickier because it had to be threaded horizontally between the holes in the roof, again attached to the second crane and then lowered to sit on top of the uprights.

Mr Grobecker said a new concrete foundation beam beneath the edge of the stage had been built to provide the base of the steelwork.

Once the new framing is in place the original cast iron work that decorated the arch will be put back in place.

Advertisement
Advertise with NZME.

Yesterday's lift hasn't been the only tricky job on site for main contractors, Wanganui firm WW Construction. Preparing for the foundation work has meant excavating 120 tonne of material but because the workmen are working within the confines of the existing building, it has all been removed by hand and wheelbarrows.

The seismic upgrade contract of $965,984 was awarded to WW Construction in April 2015 and eight of its staff began work a month later.

Mr Grobecker said the 16 cast iron internal columns have been removed which means the dress circle is currently supported by a scaffold system, which is also being used to access the ceiling space.

Workers are covering the ceiling in a layer of structural plaster which itself is tied back to the ceiling supports by 3870 stainless steel ties.

Other local firms in the contract include BPL, which handled the structural component of the upgrade, while structural steel fabrication work is being undertaken by Elite Mechanical, with plaster being installed by Allan Tong Ltd.

Save

    Share this article

Latest from Whanganui Chronicle

Whanganui Chronicle

Council officers back deconstructing St George's buildings

Whanganui Chronicle

How Whanganui achieved lowest property rates rise in NZ

Whanganui Chronicle

Whanganui-based AI service features on world stage


Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

Advertisement
Advertise with NZME.

Latest from Whanganui Chronicle

Council officers back deconstructing St George's buildings
Whanganui Chronicle

Council officers back deconstructing St George's buildings

'We’ve got a site earning minimal income for ratepayers, so we need to do something.'

14 Jul 04:59 AM
How Whanganui achieved lowest property rates rise in NZ
Whanganui Chronicle

How Whanganui achieved lowest property rates rise in NZ

14 Jul 04:21 AM
Whanganui-based AI service features on world stage
Whanganui Chronicle

Whanganui-based AI service features on world stage

14 Jul 01:25 AM


Solar bat monitors uncover secrets of Auckland’s night sky
Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

06 Jul 09:47 PM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Whanganui Chronicle e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Whanganui Chronicle
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Whanganui Chronicle
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • NZME Events
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • © Copyright 2025 NZME Publishing Limited
TOP