Rotorua Daily Post
  • Rotorua Daily Post home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Sport
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
    • All Lifestyle
    • Residential property listings
  • Property
    • All Property
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Rural
  • Sport

Locations

  • Tauranga
  • Te Puke
  • Whakatāne
  • Rotorua
  • Tokoroa
  • Taupō & Tūrangi

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales

Weather

  • Rotorua
  • Tauranga
  • Whakatāne
  • Tokoroa
  • Taupō

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Rotorua Daily Post

Last two towers installed for Mt Ruapehu's new gondola

Rotorua Daily Post
20 May, 2019 02:02 AM3 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

The final two of 14 towers forming the base of the pathway for Mt Ruapehu's new gondola are now in place. Photo / Supplied

The final two of 14 towers forming the base of the pathway for Mt Ruapehu's new gondola are now in place. Photo / Supplied

The final two of 14 towers forming the base of the pathway for Mt Ruapehu's new gondola are now in place despite challenges around the installation.

Ruapehu Alpine Lifts said both towers 11 and 7 were a challenge to install, located in difficult-to-access locations with little access to power and machinery.

Tower 11 was also in a geologically complex site, making it extra challenging.

Whakapapa general manager Jono Dean said Tower 7 was located in a really tricky spot on a ridge near Hut Flat, called AA Ridge.

"The challenge here was excavating a large enough hole for the concrete footing and it was complicated by the fact that we could only use a small excavator.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.
Work is under way on Mt Ruapehu's new $25 million gondola, which will be the largest and most technically advanced in New Zealand.  Photo / Supplied
Work is under way on Mt Ruapehu's new $25 million gondola, which will be the largest and most technically advanced in New Zealand. Photo / Supplied

"On top of this we needed to bag all of the excavated material and lift it out with the material ropeway, and store it safely until the footing was ready to be back filled. It's essentially been a hand-dug excavation."

Dean said installing Tower 11 was just as challenging.

"It's located in a small outcropping on a location we call '2nd Waterfall'. The rock is solid lava so there was no possibility of excavating a traditional footing here. In addition to this we have no way to get an excavator to this site so all the drilling had to be done with handheld units.

Advertisement
Advertise with NZME.

"Four large anchor bolts were set into the rock, glued into place and then once set, pull tested to ensure they were sufficiently strong for the foundation to be anchored to. The tower itself is the tallest on the whole lift at 22m," he said.

Next the haul rope for the gondola will be installed. Pilot lines, which are smaller in diameter, are already in place and these will be used to pull the main haul rope up and then back down the other side of the lift ready to be spliced together.

Tower 11.  Photo / Supplied
Tower 11. Photo / Supplied

The spool containing the haul rope weighs approximately 48,000kg.

Dean said the Leitner Ropeways team had faced a number of challenges along the way with the gondola project but had overcome them all very efficiently and kept construction progressing as quickly as possible.

Discover more

On your marks, get set for Godzone 2020 in Rotorua

23 May 12:50 AM

Contact Energy drilling $30m of new Taupō geothermal wells

29 May 02:51 AM

Cable now in place on new Mt Ruapehu gondola

08 Jun 02:35 AM

"Delays are expected working in an ever changing mountain environment and due to this the opening date for the Sky Waka has moved out a little from the beginning of June to the end.

"This will coincide with expected opening of the upper mountain at the end of June, our normal Whakapapa season opening date. Happy Valley will open on June 1 as scheduled."

The new high-speed Sky Waka features fifty Sky Waka gondola cabins with floor to ceiling glass for views, internal ski racks, audio and lighting and individual leather seats offering luxury to passengers.

The Sky Waka will run from the Top of the Bruce base area directly to the Knoll Ridge Café. It will transport 2400 people per hour over the 1.8km in approximately five minutes.

As a public benefit entity Ruapehu Alpine Lifts invests its proceeds back into developing the mountain's facilities and the new gondola forms part of the $100 million reinvestment strategy announced by the Ruapehu Alpine Lifts board in 2015.

Save

    Share this article

Latest from Rotorua Daily Post

Rotorua Daily Post

Rotorua chef denies arson of his own home

19 Jun 06:00 AM
Rotorua Daily Post

How to celebrate Matariki in Rotorua

19 Jun 05:01 AM
Rotorua Daily Post

Watch: 'Hand of God' controversy in schoolboy rugby scrum

19 Jun 04:29 AM

Jono and Ben brew up a tea-fuelled adventure in Sri Lanka

sponsored
Advertisement
Advertise with NZME.

Latest from Rotorua Daily Post

Rotorua chef denies arson of his own home

Rotorua chef denies arson of his own home

19 Jun 06:00 AM

The fire took place around midnight and took firefighters three hours to control.

How to celebrate Matariki in Rotorua

How to celebrate Matariki in Rotorua

19 Jun 05:01 AM
Watch: 'Hand of God' controversy in schoolboy rugby scrum

Watch: 'Hand of God' controversy in schoolboy rugby scrum

19 Jun 04:29 AM
Cold showers, decontamination for workers at scene of truck crash

Cold showers, decontamination for workers at scene of truck crash

19 Jun 04:15 AM
Help for those helping hardest-hit
sponsored

Help for those helping hardest-hit

NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Rotorua Daily Post e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Rotorua Daily Post
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Rotorua Daily Post
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2025 NZME Publishing Limited
TOP