Hawkes Bay Today
  • Hawke's Bay Today home
  • Latest news
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology

Locations

  • Napier
  • Hastings
  • Havelock North
  • Central Hawke's Bay
  • Tararua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Napier
  • Hastings
  • Dannevirke
  • Gisborne

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Hawkes Bay Today

Manawatū to Hawke's Bay highway facing disruption in wet winter

Hawkes Bay Today
26 Jul, 2022 10:48 PM4 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

The Manawatū to Hawke's Bay highway under construction. Photo / Supplied

The Manawatū to Hawke's Bay highway under construction. Photo / Supplied

The construction of a new highway between Manawatū and Hawke's Bay is facing disruption from Covid-19 and wet winter weather.

But those in charge of the long-awaited route over the lower slopes of the Ruahine Range say, 18 months into the build, progress is good and it's still on track to open in late 2024.

Te Ahu a Turanga is a four-lane highway that will connect the lower North Island's east and west coasts.

The $620 million project will replace narrow, windy routes motorists have been forced to endure since slips closed State Highway 3 through the Manawatū Gorge in 2017.

From the Palmerston North end the new highway will cross the Manawatū River then head up a steep slope.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

Speaking from a windy and wet construction site, project alliance owner interface manager Grant Kauri said it would feel familiar to motorists used to travelling on the Transmission Gully route, north of Wellington.

"It's very similar to TG - in fact, it's the same gradient, so everyone who's driven that will have the same experience here."

Cutting the climb up the hill involves huge earthworks.

Advertisement
Advertise with NZME.

"We've got about 1.8 million cubic metres [of earth] to come in here. We're currently sitting around 1.6 million," Kauri said of that section of the construction.

"It's starting to get some good shape to the alignment. We're probably around a 10 per cent gradient. That's the maximum you really want your larger vehicles to be travelling once this road is open and fully serviced."

Wet weather had halted the earthworks on Monday. Photo / Supplied
Wet weather had halted the earthworks on Monday. Photo / Supplied

When RNZ visited the site on Monday the wet weather had halted the machinery. It's churning its way through six million cubic metres of earthworks over the project's lifespan.

About 250 people are working on site at the moment. It will peak at 300 during the summer construction season.

Supervisor for one area of the project, Rob Graves, said the elements weren't always kind for the earth workers, and on Monday it wasn't safe for them.

"We'll come back tomorrow when the weather improves.

"It's been very wet - wetter than usual. We're getting some fine days, but it's a pretty hard battle."

But it's not tools down completely.

"We're still working. The boys are out there in their wet gear tying steel, pouring concrete ... We're still working away."

Kouri said despite the challenges the construction team faced, the alliance - made up of Waka Kotahi NZ Transport Agency, construction and design companies, and iwi - still expected to finish on time and on budget.

Advertisement
Advertise with NZME.

"At the moment despite Covid and the impact that it has, not only on us as a project, but managing isolation and those types of things, there's an impact with our supply chain.

"So for us, our aim is still 2024, but we're just assessing that as it goes."

Some of the most impressive features of the new road are at the Manawatū end, where a pair of 300-metre-long bridges will ease motorists into their steep ascent towards the wind farm at the top of the hill.

One bridge is a viaduct over a wetland.

Piers for the other are appearing from the riverbed, as workers operate from a temporary span next door.

"Basically we're building a bridge to build a bridge," Kouri said.

Advertisement
Advertise with NZME.

"At the end of the project that bridge and all its material will get taken away - picked up and moved on to another project."

It's expected motorists will be able to travel the new road's 11.5 kilometres in 13 minutes.

A trip between Manawatū and Hawke's Bay now can take double that.

- RNZ

Save

    Share this article

Latest from Hawkes Bay Today

Hawkes Bay Today

Woman tied to a pole and gagged during 100 assaults from partner

Premium
Hawkes Bay Today

'Bringing the community together': Young new owner's plans for Hastings cinema

Hawkes Bay Today

Hastings drinking water and waste water upgrades continue


Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

Advertisement
Advertise with NZME.

Latest from Hawkes Bay Today

Woman tied to a pole and gagged during 100 assaults from partner
Hawkes Bay Today

Woman tied to a pole and gagged during 100 assaults from partner

Court of Appeal upholds jail term of three years and two months.

14 Jul 05:00 AM
Premium
Premium
'Bringing the community together': Young new owner's plans for Hastings cinema
Hawkes Bay Today

'Bringing the community together': Young new owner's plans for Hastings cinema

14 Jul 04:29 AM
Hastings drinking water and waste water upgrades continue
Hawkes Bay Today

Hastings drinking water and waste water upgrades continue

13 Jul 10:13 PM


Solar bat monitors uncover secrets of Auckland’s night sky
Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

06 Jul 09:47 PM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Hawke's Bay Today e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Hawke's Bay Today
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Hawke's Bay Today
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • NZME Events
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • © Copyright 2025 NZME Publishing Limited
TOP