Hawkes Bay Today
  • Hawke's Bay Today home
  • Latest news
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology

Locations

  • Napier
  • Hastings
  • Havelock North
  • Central Hawke's Bay
  • Tararua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Napier
  • Hastings
  • Dannevirke
  • Gisborne

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • What the Actual
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Hawkes Bay Today

Hastings poised for new water facility concepts

Hawkes Bay Today
14 Aug, 2020 04:36 AM3 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

An artist's impression of the water treatment and storage facility on the corner of Southampton St East and Hastings St South. Photo / Supplied

An artist's impression of the water treatment and storage facility on the corner of Southampton St East and Hastings St South. Photo / Supplied

New designs for a water treatment and reservoir storage facility on the corner of Southampton St East and Hastings St South is "almost ready" to be put before residents.

The council said the site was selected last year because of its proximity to the existing Eastbourne drinking water bores and pipe network.

Hastings District Council Mayor Sandra Hazlehurst said the construction of two urban water treatment and storage facilities were "critical elements" of Hastings' Drinking Water Strategy (2018).

The council is currently going through a resource consent process for one site located at Frimley Park, while the other is the Eastbourne site.

"Water storage and treatment facilities are a key component of keeping our drinking water safe, adding capacity and resilience to the network, and enabling Hastings to meet National Drinking Water Compliance Standards," she said.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

The final detail of the new design, named Waiaroha in consultation with mana whenua, will initially be shared with Eastbourne site neighbours and then with the wider community as part of the council's engagement process.

Hazlehurst said an initial concept made public last year drew "considerable feedback", which had informed the current proposal.

"Over the next few weeks, we will be sharing our site plans and design options for the water treatment and storage facility with our community. This includes using trees, landscaping and architectural features to lessen the visual impact of the water storage while also creating an appealing space for the community to enjoy."

Advertisement
Advertise with NZME.

While initially one tall tank had been planned, this has now been changed to two smaller tanks. Between them they would hold the same amount of water but the profile would be lower. Extensive landscaping, including keeping the existing trees and putting in new plantings, would further soften the visual impact.

The two tanks would be set as far back as possible into the site, with a single-storey treatment building in-between them.

Council has also proposed to build and operate a water treatment and storage facility in Frimley Park, which includes a reservoir 38m in diameter and 9m tall to roof level, with a 6m-high domed roof and a utility building with a 480sq m floor area.

Last month a Hastings lobby group opposed to the proposal to construct the reservoir in the park claimed the structure would "industrialise" the popular amenity.

Discover more

No cases in Hawke's Bay, but 13 new cases in Auckland

16 Aug 01:32 AM

A petition opposing the proposal was submitted to the council during a commissioner's hearing - the decision of which is expected in the coming weeks.

The council said the cost of the necessary infrastructure is $14 million, which is budgeted for under the Hastings Drinking Water Strategy. Any costs outside of the infrastructure and required mitigation, estimated at $4 to $6m (subject to final design), would be funded externally – not by ratepayers.

In September last year, in the midst of a Hastings District mayoral race, details of a multimillion-dollar Water Central Facility in Hastings was leaked to Hawke's Bay Today.

That initial concept was abandoned earlier this year.

The council then launched a $25,000 investigation to find the source of the leak, which was unsuccessful.

Save

    Share this article

Latest from Hawkes Bay Today

Hawkes Bay Today

Napier Aquatic Centre open again after repair of hazardous floor

08 May 10:12 PM
Hawkes Bay Today

'10 billion web threads': The mysterious spider webs coating Hawke's Bay

08 May 09:49 PM
Premium
Hawkes Bay Today

On The Up: Digger driver clears 37 tyres from a beach in one day

08 May 06:00 PM

One tiny baby’s fight to survive

sponsored
Advertisement
Advertise with NZME.

Latest from Hawkes Bay Today

Napier Aquatic Centre open again after repair of hazardous floor

Napier Aquatic Centre open again after repair of hazardous floor

08 May 10:12 PM

A man slipped on the newly installed flooring on opening day.

'10 billion web threads': The mysterious spider webs coating Hawke's Bay

'10 billion web threads': The mysterious spider webs coating Hawke's Bay

08 May 09:49 PM
Premium
On The Up: Digger driver clears 37 tyres from a beach in one day

On The Up: Digger driver clears 37 tyres from a beach in one day

08 May 06:00 PM
Premium
What a friend we have in cheeses: Wyn Drabble

What a friend we have in cheeses: Wyn Drabble

08 May 06:00 PM
Connected workers are safer workers 
sponsored

Connected workers are safer workers 

NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Hawke's Bay Today e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Hawke's Bay Today
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Hawke's Bay Today
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • What the Actual
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven CarGuide
  • iHeart Radio
  • Restaurant Hub
NZME
  • NZME Events
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • © Copyright 2025 NZME Publishing Limited
TOP