Bay of Plenty Times
  • Bay of Plenty Times home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Sport
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport

Locations

  • Coromandel & Hauraki
  • Katikati
  • Tauranga
  • Mount Maunganui
  • Pāpāmoa
  • Te Puke
  • Whakatāne
  • Rotorua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Thames
  • Tauranga
  • Whakatāne
  • Rotorua

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / Bay of Plenty Times

Onetai Bridge bridge replacement on SH26 taps innovative design

Hauraki Coromandel Post
26 Apr, 2023 05:00 PM4 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

The replacement of Onetai Bridge, halfway between Paeroa and Kōpū on State Highway 26, marks a giant leap in bridge design. Photo / Supplied

The replacement of Onetai Bridge, halfway between Paeroa and Kōpū on State Highway 26, marks a giant leap in bridge design. Photo / Supplied

Onetai Bridge, about halfway between Paeroa and Kōpū on State Highway 26, might reach just 9m over a tiny stream, but its upcoming replacement marks a giant leap in bridge design for Waka Kotahi NZ Transport Agency.

It will be the first state highway bridge built from timber in 50 years, representing an exciting move towards using climate-friendly materials.

It’s the timber elements of the new design that make the project more than just a run-of-the-mill replacement, says Waka Kotahi regional manager maintenance and operations Rob Campbell.

“Road bridges in Aotearoa New Zealand are generally built with concrete or steel. Onetai will be the first to mark a return to more-sustainable design, with timber beams and deck.

“We’re hoping to make this the new norm, so while it might seem like a minor project, it marks a groundbreaking shift in design for bridge replacements on state highways.”

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

It all comes down to the magic of layering — using an engineered timber product called glulam, which is made from layers (laminates) of wood glued together. As Campbell explains, glulam has twice the strength per kilogram compared with steel and is specially designed to be hard wearing and durable.

“The new Onetai Bridge is designed to last at least 100 years, linking the greater Waikato region with the Coromandel Peninsula, and providing a small but vital part of our state highway network,” he says.

“The replacement will add to the resilience and safety of this route, as the new design will be stronger and wider than the old bridge.”

Advertisement
Advertise with NZME.

Myriad benefits

Glulam is being used increasingly around the world for bridges, both on highways and on local roads.

“The first and most obvious benefit is that glulam’s main component, pine wood, is grown right here in Aotearoa and therefore does not need to be mined or go through the high-energy manufacturing processes needed to make steel and concrete,” Campbell says.

“New Zealand glulam is made from responsibly-sourced radiata pine and actually has a negative carbon footprint during the production phase. This is because the trees have absorbed carbon dioxide from the atmosphere during the 30 to 40 years they take to reach maturity, and new growth starts that process all over again.”

Glulam will last for decades with a minimum of maintenance, and can absorb energy effectively from earthquakes; it also has good fire resistance. “It might seem that wood would pose a fire risk, but large-section timber in fact performs very well in fires because timber chars at a known rate and does not deform like steel,” Campbell explains.

“One of the key benefits of a timber structure is it’s lightweight. This means we can significantly reduce the size of foundations which in turn cuts down on carbon, material costs and construction time.”

Safety features

The new Onetai Bridge will be the same length as the old one, but will be 3m wider, and boasts extra safety features. These include a new type of side barrier that can be fitted right to the outside edge of the bridge, and therefore gives drivers more lane space, helping reduce the risk of head-on crashes.

The bridge will have simple concrete foundations, and new scour protection both upstream and downstream. Scour, which happens when water flows change or rivers flood, is a leading cause of bridge failure. With our climate changing rapidly, there is a renewed urgency in using scour protection to maintain the safety of bridges.

Waka Kotahi undertook a business case in 2020 for the replacement of the two-lane bridge, which, while still safe to use, is nearing the end of its life. Construction funding was approved under the 2021–24 National Land Transport Programme (NLTP), and the project has moved into the detailed design stage, with construction planned to begin in October.

With the consenting process underway, specialist structural consultants have been brought in to advise on the timber beams and deck.

During the business case, Waka Kotahi spoke with iwi partners, key stakeholders including the local council, and affected landowners to gain information for the initial concept design.

Advertisement
Advertise with NZME.

“We’ll continue these conversations throughout the design process, while also making sure the surrounding communities along SH26, from Paeroa to Kōpū, are kept informed. Once the detailed design is completed, we’ll be able to share more information about construction and timing,” says Mr Campbell.

In the meantime, Onetai Stream Bridge remains safe to use. Waka Kotahi has an active bridge maintenance, strengthening and replacement programme, which helps provide a good overview of the state of all state highway bridges. Safety is the No. 1 priority, and Waka Kotahi carries out regular inspections to ensure all state highway bridges in New Zealand remain safe.

Save

    Share this article

Latest from Bay of Plenty Times

Bay of Plenty Times

ECE reliever described child exploitation material as 'grossly beautiful'

Bay of Plenty Times

Serious crash closes road, one injured

Bay of Plenty Times

Fire crews rescue driver from car that hit building


Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

Advertisement
Advertise with NZME.

Latest from Bay of Plenty Times

ECE reliever described child exploitation material as 'grossly beautiful'
Bay of Plenty Times

ECE reliever described child exploitation material as 'grossly beautiful'

Phoebe Robertson said she was 'addicted' to disgusting things.

18 Jul 08:00 AM
Serious crash closes road, one injured
Bay of Plenty Times

Serious crash closes road, one injured

18 Jul 05:37 AM
Fire crews rescue driver from car that hit building
Bay of Plenty Times

Fire crews rescue driver from car that hit building

18 Jul 03:21 AM


Solar bat monitors uncover secrets of Auckland’s night sky
Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

06 Jul 09:47 PM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Bay of Plenty Times e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Bay of Plenty Times
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Bay of Plenty Times
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2025 NZME Publishing Limited
TOP