Bay of Plenty Times
  • Bay of Plenty Times home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Sport
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport

Locations

  • Coromandel & Hauraki
  • Katikati
  • Tauranga
  • Mount Maunganui
  • Pāpāmoa
  • Te Puke
  • Whakatāne
  • Rotorua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Thames
  • Tauranga
  • Whakatāne
  • Rotorua

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Bay of Plenty Times

Failed Tauranga car parking building: Engineers accused of negligence before disciplinary board

Jeremy Wilkinson
By Jeremy Wilkinson
Open Justice multimedia journalist, Palmerston North·NZ Herald·
5 Aug, 2024 06:29 AM5 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

The unfinished Harrington St parking building. Photo / George Novak

The unfinished Harrington St parking building. Photo / George Novak


A car parking building that cost $19 million to build was riddled with structural errors meaning its owner had to cut its losses and sell it for just $1.

Now, three engineers who did the maths on the building that was ultimately deemed too expensive to fix have been accused of negligence.

The site between Harington and Hamilton Sts in downtown Tauranga was once intended for a multi-storey public transport hub with 550 parks plus showers and lockers, intended to ease some of the city’s parking woes.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

However, construction stalled in 2018 when serious structural issues were found. The Tauranga City Council abandoned construction in 2020, having already spent $19m.

Rather than demolishing the half-built hub, in 2021 the council sold the site and structure for $1 to developers and cut its losses.

Mayor Tenby Powell said at the time the cost of fixing the problems would likely blow out past the original $29m budget.

“As unpalatable as it is to abandon a project which has already cost $19 million, our expert advice makes it clear that the completion options available to us would simply be sending good money after bad,” Powell said.

Advertisement
Advertise with NZME.

Since that decision to abandon the building, Tauranga City Council lodged a complaint with Engineering New Zealand (ENZ) about the conduct of three engineers who had a hand in designing it.

Engineers before Disciplinary Committee

Today, a Disciplinary Committee convened in Wellington where the lead engineer who did the original designs is charged with acting outside his area of competency and performing engineering services negligently or incompetently.

That engineer, who has interim name suppression, has denied any wrongdoing in the litany of errors identified with the building’s designs.

A second engineer who peer-reviewed his designs is facing similar charges, while a third engineer - and a colleague of the first - who also peer-reviewed the work has admitted he made errors in regard to the seismic strengthening.

“Something has gone seriously awry at the design consenting stage,” said Sean McCusker, counsel for ENZ’s investigating Committee which brought the charges against the three engineers.

“That critical process was missed and that has led to significant consequences for the ratepayers of Tauranga.”

Tauranga City Council abandoned the building in 2020. Photo / George Novak
Tauranga City Council abandoned the building in 2020. Photo / George Novak

McCusker said part of the issue was whether the original design was flawed, or whether subsequent redesignes caused the issues.

“There are important checks and safeguards and building owners and consent authorities are entitled to place reliance on those,” he said.

The lead engineer claims his designs were accurate and that it was a colleague at his firm’s redesigns that caused the structural issues.

McCusker however said the committee had concerns with those original designs, which is why they’ve levelled charges against the lead engineer.

Advertisement
Advertise with NZME.

Signing off compliance

The lead engineer led the design of the foundations and superstructure of the building and signed them off as being compliant with the building code.

It’s alleged that he acted outside his area of expertise in regards to the way he designed the building’s seismic strengthening.

It’s also alleged that he was negligent or incompetent in designing a range of aspects of the building including the lateral bracing, retaining walls, and structural steel columns.

When the lead engineer left the firm his calculations were peer-reviewed by a second engineer at a separate firm who also signed off the designs.

It’s alleged he worked outside his skillset in regards to a seismic strengthening design used, and that he was negligent in reviewing the original design and rubber-stamping it.

A Disciplinary Committee of Engineering New Zealand convened in Wellington for a two-week hearing. Photo / Jeremy Wilkinson
A Disciplinary Committee of Engineering New Zealand convened in Wellington for a two-week hearing. Photo / Jeremy Wilkinson

This engineer has accepted liability for some aspects of the errors but has disputed others.

Advertisement
Advertise with NZME.

The third engineer was a colleague of the lead designer and after problems with the original design were discovered he signed off on revisions intended to address those errors.

That engineer has admitted liability for failing to take into consideration seismic gaps for the ramps in the carpark and for signing off on the revised designs which also had errors.

Rob Jury, the chief engineer at Beca, was called as a witness on Monday and said the early designs, which were two-dimensional, were “quite light” on analysis and in his opinion needed to be more sophisticated.

He said that, in his opinion, it would have been difficult for construction workers to pick up those gaps in the design or to follow the instructions.

Three engineers are facing disciplinary action after structural issues forced the Tauranga City Council to abandon the building. Photo / George Novak
Three engineers are facing disciplinary action after structural issues forced the Tauranga City Council to abandon the building. Photo / George Novak

“The constructor can be expected to pick up issues around geometry… but he cannot pick up issues around design,” he said.

Jury, who has 40 years of experience in the industry, wasn’t aware of the Innovative Dissipative (INERD) bracing design system that was used for seismic strengthening.

Advertisement
Advertise with NZME.

“I felt immediately that the various features of that system was an appropriate concept but didn’t have enough backup in the calculations,” he said.

“It left a lot of questions.

“Even his [the lead engineer] colleagues didn’t recognise what the intent was, because they went and changed it all.”

Jury said that in his view the design was signed off despite “unfinished business” and there was no hold placed on the drawings despite this.

Two weeks have been set down for the hearing, which continues tomorrow.

Jeremy Wilkinson is an Open Justice reporter based in Manawatū covering courts and justice issues with an interest in tribunals. He has been a journalist for nearly a decade and has worked for NZME since 2022.

Advertisement
Advertise with NZME.




Save

    Share this article

Latest from Bay of Plenty Times

Bay of Plenty Times

More oval balls for Bay Oval? Sold-out Super Rugby game sparks calls for repeat

19 Jun 06:00 PM
Bay of Plenty Times

Winter fire warning for seniors after Waihī death

19 Jun 06:00 AM
Bay of Plenty Times

Meth, ammunition, homemade taser seized in dawn police raid

19 Jun 04:30 AM

Jono and Ben brew up a tea-fuelled adventure in Sri Lanka

sponsored
Advertisement
Advertise with NZME.

Latest from Bay of Plenty Times

More oval balls for Bay Oval? Sold-out Super Rugby game sparks calls for repeat

More oval balls for Bay Oval? Sold-out Super Rugby game sparks calls for repeat

19 Jun 06:00 PM

'It’s an expensive asset, and it should be well-used.'

Winter fire warning for seniors after Waihī death

Winter fire warning for seniors after Waihī death

19 Jun 06:00 AM
Meth, ammunition, homemade taser seized in dawn police raid

Meth, ammunition, homemade taser seized in dawn police raid

19 Jun 04:30 AM
League player's preventable death prompts coroner's warning of 'run it straight' trend

League player's preventable death prompts coroner's warning of 'run it straight' trend

18 Jun 11:35 PM
Help for those helping hardest-hit
sponsored

Help for those helping hardest-hit

NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Bay of Plenty Times e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Bay of Plenty Times
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Bay of Plenty Times
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2025 NZME Publishing Limited
TOP