Hawkes Bay Today
  • Hawke's Bay Today home
  • Latest news
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology

Locations

  • Napier
  • Hastings
  • Havelock North
  • Central Hawke's Bay
  • Tararua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Napier
  • Hastings
  • Dannevirke
  • Gisborne

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Hawkes Bay Today

Hawke’s Bay Expressway plan includes new bridge

Doug Laing
By Doug Laing
Multimedia Journalist·Hawkes Bay Today·
19 Dec, 2024 08:44 PM3 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

Holidaymakers in Auckland and Wellington can expect the heaviest traffic before Christmas and again before New Year. Video / Alyse Wright, NZ Herald

A 280-metre bridge to carry two lanes of northbound traffic over the Tutaekuri River near Taradale will be part of the project widening 6.5km of the Hawke’s Bay Expressway to four lanes.

NZTA Waka Kotahi's plan for 6.5km of four-laning of the Hawke's Bay Expressway, including an additional bridge parallel to the existing bridge over the Tutaekuri River.
NZTA Waka Kotahi's plan for 6.5km of four-laning of the Hawke's Bay Expressway, including an additional bridge parallel to the existing bridge over the Tutaekuri River.

The new structure will be built to the west alongside the existing bridge which currently carries one lane in each direction, but in the future will carry southbound traffic only in the biggest step to reduce the congestion which multiplied with the loss of the one-way Brookfields Bridge in Cyclone Gabrielle, and the loss for six months of the use of the Redclyffe Bridge, which had to have a span replaced.

The cyclone in February 2023 caused hundreds of millions of dollars of damage to bridges in Hawke’s Bay.

Work begins next month alongside the existing bridge, with the section of the expressway between the roundabouts at Taradale Rd and Pākōwhai and Links roads, including the bridge and the Kennedy Rd overbridge the focus for Stage 1 of the four-stage project, says NZ Transport Agency Waka Kotahi (NZTA) regional manager of infrastructure delivery Rob Partridge.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

Work has already started beside the Kennedy Rd off-ramp to clear vegetation, laying repurposed silt from the aftermath of Cyclone Gabrielle, provided by the Silt Recovery Taskforce.

Funding was announced earlier this year for the biggest project on the expressway since it opened more than 20 years ago.

Between January 8 and March 31, crews will be taking the same approach further south, alongside the Tutaekuri bridge, with a temporary 70km/h speed limit through this area.

Road users would also notice a lot of activity off to the side of the northbound lane, including vegetation removal from mid-January and silt transportation and construction from the beginning of February.

Advertisement
Advertise with NZME.

Partridge said the Rotary cycle path and walkway will be slightly realigned in February and there will, at times, be work site trucks crossing a small section, with traffic management in place in the interests of safety.

There will also be night-time maintenance closures of sections of the expressway on January 20-25.

Crews will be sealing the Kennedy Rd on-ramp, sealing between Prebensen Drive and Taradale Rd, and between Meeanee and Pākōwhai/Links roads, and other work including median barrier replacement and lane marking.

The four-laning team will also take the opportunity during the closures to install a temporary steel barrier as part of the Tutaekuri bridge work.

Partridge said the work already completed at the Kennedy Rd off-ramp and the work at Tutaekuri bridge site will enable building of the approaches to the new bridge.

“The ground will be compacted and monitored over a period of at least 12 months, allowing the ground to settle and consolidate sediment prior to future construction works,” he said.

Main works construction is expected to begin late next year.

Doug Laing is a senior reporter based in Napier with Hawke’s Bay Today, and has 51 years of journalism experience, 41 of them in Hawke’s Bay, in news gathering, including breaking news, sports, local events, issues, and personalities.

Save

    Share this article

Latest from Hawkes Bay Today

Hawkes Bay Today

Stabbing in Hawke’s Bay, one taken to hospital with serious wounds

19 Jun 10:45 PM
Hawkes Bay Today

Air NZ plane lands safely after mid-air maintenance alert

19 Jun 09:14 PM
Hawkes Bay Today

'Living expressions': Pou returned to Hastings Civic Square after restoration

19 Jun 09:00 PM

Jono and Ben brew up a tea-fuelled adventure in Sri Lanka

sponsored
Advertisement
Advertise with NZME.

Latest from Hawkes Bay Today

Stabbing in Hawke’s Bay, one taken to hospital with serious wounds

Stabbing in Hawke’s Bay, one taken to hospital with serious wounds

19 Jun 10:45 PM

One person was taken into custody at the scene.

Air NZ plane lands safely after mid-air maintenance alert

Air NZ plane lands safely after mid-air maintenance alert

19 Jun 09:14 PM
'Living expressions': Pou returned to Hastings Civic Square after restoration

'Living expressions': Pou returned to Hastings Civic Square after restoration

19 Jun 09:00 PM
Our top Premium stories this year: Special offer for Herald, Viva, Listener

Our top Premium stories this year: Special offer for Herald, Viva, Listener

19 Jun 08:11 PM
Help for those helping hardest-hit
sponsored

Help for those helping hardest-hit

NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Hawke's Bay Today e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Hawke's Bay Today
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Hawke's Bay Today
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • NZME Events
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • © Copyright 2025 NZME Publishing Limited
TOP