Hawkes Bay Today
  • Hawke's Bay Today home
  • Latest news
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Sport
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology

Locations

  • Napier
  • Hastings
  • Havelock North
  • Central Hawke's Bay
  • Tararua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Napier
  • Hastings
  • Dannevirke
  • Gisborne

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • What the Actual
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Hawkes Bay Today

Dannevirke: Winter delays work by 'skinny bridge'

By Christine McKay
Hawkes Bay Today·
26 May, 2016 04:59 PM3 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

Development on the new road and culvert to replace the 90-year-old Whakaruatapu Bridge, known by locals as "the skinny bridge", north of Dannevirke on State Highway 2. Photo / Warren Buckland

Development on the new road and culvert to replace the 90-year-old Whakaruatapu Bridge, known by locals as "the skinny bridge", north of Dannevirke on State Highway 2. Photo / Warren Buckland

With work delayed on the new culvert to replace the Whakaruatapu Bridge north of Dannevirke, the new road will not be open until December, rather than May as earlier indicated.

"From April to May our contractors have made good progress forming the new road alignment and the pavement is being steadily progressed with the intention that the section north of the bridge will be completed before winter sets in," a New Zealand Transport Agency (NZTA) spokesperson said.

"However, while we were originally aiming for traffic to be able to use the new road and culvert by May, the combination of bad weather and unexpected geotechnical challenges means work on the culvert has taken longer than expected."

Work on the new culvert and road adjacent to the 90-year-old Whakaruatapu Bridge - "the skinny bridge" - north of Dannevirke.
Work on the new culvert and road adjacent to the 90-year-old Whakaruatapu Bridge - "the skinny bridge" - north of Dannevirke.

From a geotechnical perspective, the site has been challenging, with the bedding steeply inclined and constantly varied materials.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

In some areas, the road is as much as 11m lower than the existing road and through this depth the material has varied from pit metal, to sand, to weak silts, hard papa and a young, fragile black coal.

To counteract the varied materials, the contractor has needed to complete additional ground improvements, while some cut slopes have had to be re-cut at flatter angles because of very weak layers.

With the work weather-sensitive, contractors will not work on the culvert over winter but will return to the site in October.

"It is expected the road over the culvert will be able to be used from early December when the existing bridge will be demolished and further landscaping and tidy-up work will take place throughout December and January," the NZTA spokesperson said.

Advertisement
Advertise with NZME.

Tararua Mayor Roly Ellis said he was not surprised by the delays.

"You can't defeat the weather and such a massive project as this in a very big dip is going to be affected by the weather," he told the Dannevirke News.

"It's far better to do it once and do it properly."

However, Mr Ellis said he believed everyone would be glad to see the metal at the north end of Whakaruatapu Bridge, known to locals as "the skinny bridge", sealed.

Discover more

Dannevirke: Fan pushes to keep rural race days

24 May 04:58 PM

Dannevirke: Food Act costs put strain on butcher

24 May 04:59 PM

Dannevirke: Latest aviary sure to draw more visitors

25 May 04:59 PM

Dannevirke: Landmark year for author

29 May 04:59 PM

"I would also like to see the 70km/h signs at either side of the existing bridge remain in place, as they help prevent accidents as people rubberneck to try and get a better view of the work.

"And while delays are to be expected, it's been a great achievement to get the money for this project and to see it well under way."

Excavated material from the new road alignment is being used to build up the road over the new culvert, with the new road position easily seen from State Highway 2. Approximately 40,000cu m of earth has been removed from the site to increase visibility for safety on the new alignment, and much of it has been done overnight to reduce the impact of the work on road users.

The NZTA spokesperson said the aim had been to reduce delays for road users wherever possible. "We appreciate the courtesy and understanding motorists travelling through the site have shown."

Save

    Share this article

Latest from Hawkes Bay Today

Hawkes Bay Today

Deer dies after dash on to Hawke's Bay Airport runway

08 May 10:51 PM
Hawkes Bay Today

Farmers unite against council's water restrictions in Hawke's Bay

08 May 10:32 PM
Hawkes Bay Today

Napier Aquatic Centre open again after repair of hazardous floor

08 May 10:12 PM

One tiny baby’s fight to survive

sponsored
Advertisement
Advertise with NZME.

Latest from Hawkes Bay Today

Deer dies after dash on to Hawke's Bay Airport runway

Deer dies after dash on to Hawke's Bay Airport runway

08 May 10:51 PM

It ran down city streets, jumping fence on to runway – then Animal Control intervened.

Farmers unite against council's water restrictions in Hawke's Bay

Farmers unite against council's water restrictions in Hawke's Bay

08 May 10:32 PM
Napier Aquatic Centre open again after repair of hazardous floor

Napier Aquatic Centre open again after repair of hazardous floor

08 May 10:12 PM
'10 billion web threads': The mysterious spider webs coating Hawke's Bay

'10 billion web threads': The mysterious spider webs coating Hawke's Bay

08 May 09:49 PM
Connected workers are safer workers 
sponsored

Connected workers are safer workers 

NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Hawke's Bay Today e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Hawke's Bay Today
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Hawke's Bay Today
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • What the Actual
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven CarGuide
  • iHeart Radio
  • Restaurant Hub
NZME
  • NZME Events
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • © Copyright 2025 NZME Publishing Limited
TOP