Bay of Plenty Times
  • Bay of Plenty Times home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Sport
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport

Locations

  • Coromandel & Hauraki
  • Katikati
  • Tauranga
  • Mount Maunganui
  • Pāpāmoa
  • Te Puke
  • Whakatāne
  • Rotorua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Thames
  • Tauranga
  • Whakatāne
  • Rotorua

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / Bay of Plenty Times

New $64m Pekatahi Bridge aims to ease SH2 bottleneck and secure vital freight link

Bay of Plenty Times
11 Dec, 2025 01:02 AM3 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save
    Share this article
The asphalt over wooden boards on the deck of the Pekatahi Bridge began to deteriorate within days of repairs. Photo / Troy Baker, Whakatāne Beacon

The asphalt over wooden boards on the deck of the Pekatahi Bridge began to deteriorate within days of repairs. Photo / Troy Baker, Whakatāne Beacon

The Pekatahi Bridge on State Highway 2 in the Eastern Bay of Plenty is set to be replaced at a cost of about $64 million.

Transport Minister Chris Bishop said today the bridge near Tāneatua was “not fit for purpose and needs to be replaced”.

About $5 million has been approved by the NZ Transport Agency (NZTA) for the detailed design and consenting of a new two-lane bridge.

The new bridge was expected to cost between $64m and $69m.

Bishop said this included the demolition of the existing bridge.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

NZTA already owned the necessary land to deliver the project.

He said SH2 was a vital link connecting Gisborne and the Tairāwhiti region with the Bay of Plenty, Hamilton and Auckland.

“The highway supports tourism, essential fuel and food supplies and the export of local products.”

Advertisement
Advertise with NZME.

Bishop said the local community and the freight industry had been vocal with their concerns about the one-lane bridge.

“It’s rough, uneven and requires frequent, disruptive maintenance. Originally, a deck replacement was planned to begin in early 2026, however, detailed inspections have revealed a full replacement is needed.

 The 100-year-old, one-lane Pekatahi Bridge near Taneatua is the main route for freight between the East Coast and Tauranga and Rotorua.
The 100-year-old, one-lane Pekatahi Bridge near Taneatua is the main route for freight between the East Coast and Tauranga and Rotorua.

“Replacing the existing one-lane bridge is in the best interests of the region to support economic growth, strengthen the state highway network, and ensure more reliable journey times for locals and freight moving between Tairāwhiti, the Bay of Plenty and the Port of Tauranga.”

Construction of the two-lane bridge was likely to begin in mid-2027, and would take about 18 months to complete.

He said final costs would be confirmed once construction funding was approved and a contractor was appointed.

“The new two-lane bridge will be constructed next to the current bridge, meaning no long-term closure of the current bridge during construction. This will minimise disruption and ensure continued access for the local community and road users.

“The bridge would be delivered using a modern standard design, making it efficient and cost-effective to build. The design will include earthquake-resilient foundations for improved seismic safety, and an elevated deck to protect against flooding and extreme weather. It will also be built to a standard that accommodates High Productivity Motor Vehicles, meaning better outcomes for freight.”

In the meantime, Bishop said NZTA would ensure the existing bridge continued to service the community by installing steel plates on its deck and actively monitoring and maintaining the structure.

This work was expected to start early next year.

East Coast MP Dana Kirkpatrick said she was “delighted” the bridge would be replaced with a “two-laned sensible option”. .

Advertisement
Advertise with NZME.

“As the only remaining one-lane structure on SH2, and not being in great shape, it has been the topic of many a conversation in the Eastern BOP over the past two years and beyond.

“It is a critical route for inter-regional traffic, exports to the ports and our local communities and this commitment by the Government and NZTA is welcome news.”

Save
    Share this article

Latest from Bay of Plenty Times

Bay of Plenty Times

Cambridge Rd lane reopened in time for school

02 Feb 02:27 AM
Bay of Plenty Times
|Updated

Mauao landslide: Council opts to bring in external reviewer

02 Feb 02:03 AM
Bay of Plenty Times

'Dream come true': Coromandel man captures near 100kg marlin after quarter-century quest

02 Feb 01:32 AM

Sponsored

Discover Australia with AAT Kings’ easy-going guided holidays 

15 Jan 12:33 AM
Advertisement
Advertise with NZME.

Latest from Bay of Plenty Times

Cambridge Rd lane reopened in time for school
Bay of Plenty Times

Cambridge Rd lane reopened in time for school

All turning options are due to return from tomorrow after night asphalting.

02 Feb 02:27 AM
Mauao landslide: Council opts to bring in external reviewer
Bay of Plenty Times
|Updated

Mauao landslide: Council opts to bring in external reviewer

02 Feb 02:03 AM
'Dream come true': Coromandel man captures near 100kg marlin after quarter-century quest
Bay of Plenty Times

'Dream come true': Coromandel man captures near 100kg marlin after quarter-century quest

02 Feb 01:32 AM


Discover Australia with AAT Kings’ easy-going guided holidays 
Sponsored

Discover Australia with AAT Kings’ easy-going guided holidays 

15 Jan 12:33 AM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Bay of Plenty Times e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Bay of Plenty Times
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Bay of Plenty Times
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2026 NZME Publishing Limited
TOP