There will soon be both a high road and a low road on a stretch of SH4 in the Parapara hills.
A lower, temporary road is being built along the line of the former highway. While it is in use the contractors, Higgins, will be able to do some long-term
An alternate, temporary road is being built on SH4 in the Parapara, to enable repair on the usual highway. Photo / Bevan Conley
There will soon be both a high road and a low road on a stretch of SH4 in the Parapara hills.
A lower, temporary road is being built along the line of the former highway. While it is in use the contractors, Higgins, will be able to do some long-term
Chris Hipkins agreed to meet him in Wellington after the Prime Minister said 'no'.