Northern Advocate
  • Northern Advocate home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Sport
  • Property
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport
  • Property
    • All Property
    • Residential property listings

Locations

  • Far North
  • Kaitaia
  • Kaikohe
  • Bay of Islands
  • Whangārei
  • Kaipara
  • Mangawhai
  • Dargaville

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Kaitaia
  • Whangārei
  • Dargaville

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / Northern Advocate

Slip on Whangarei stormwater holding dam shored up

Northern Advocate
27 Jun, 2017 11:00 PM2 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save
    Share this article
A slip on the upstream bank of the Maunu stormwater detention dam has cost $80,000 to fix. Photo/John Stone

A slip on the upstream bank of the Maunu stormwater detention dam has cost $80,000 to fix. Photo/John Stone

Work should be completed today on shoring up a slip near the inlet channel of the Maunu stormwater detention dam.

About 450sq m of rain soaked loose ground and trees 50 metres upstream slipped in May.

While it did not affect the dam's structure, engineers recommended the repair to stop material washing into the inlet channel and impeding the release of water, Northland Regional Council (NRC) Environmental Services general manager Bruce Howse said.

The repair bill has added $80,000 to the $11 million cost of the dam, being footed by 17,000 Northland Regional ratepayers with properties in the downstream area that now benefits from flood protection.

The repair bill will extend the 20-year term repayment by three months, based on no variations to future costs and revenue estimates.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

The 18m-high dam, capable of holding up to 1.27 million cubic metres of floodwater, was opened a year ago and is the largest project of its kind undertaken by the NRC.

Officially called Hopua te Nihotetea, most of the time it will hold no water but will come into its own in a large storm. It works by slowly releasing trapped stormwater over a couple of days, reducing downstream flood swelling by at least half a metre.

The dam will not completely stop floodwater from affecting the CBD as the Waiarohia Stream and tidal Hatea River also flow into the area, but it will slow the flow down the Raumanga Stream and other tributaries.

Advertisement
Advertise with NZME.
Save
    Share this article

Latest from Northern Advocate

Northern Advocate

Northland crash costs laid bare as ACC reveals $46m bill and young driver risk

08 May 06:00 AM
Northern Advocate

Dirt bike death probe continues after body released to family

08 May 04:40 AM
Northern Advocate

'One drama after another': Artists stuck in leaky, crime-hit community hall

08 May 04:00 AM

Sponsored

Future of wealth in NZ: A conversation with ASB CEO Vittoria Shortt

03 May 11:20 PM
Advertisement
Advertise with NZME.

Latest from Northern Advocate

Northland crash costs laid bare as ACC reveals $46m bill and young driver risk
Northern Advocate

Northland crash costs laid bare as ACC reveals $46m bill and young driver risk

Northland road crashes cost ACC $46m as 24 deaths marked in city march

08 May 06:00 AM
Dirt bike death probe continues after body released to family
Northern Advocate

Dirt bike death probe continues after body released to family

08 May 04:40 AM
'One drama after another': Artists stuck in leaky, crime-hit community hall
Northern Advocate

'One drama after another': Artists stuck in leaky, crime-hit community hall

08 May 04:00 AM


Future of wealth in NZ: A conversation with ASB CEO Vittoria Shortt
Sponsored

Future of wealth in NZ: A conversation with ASB CEO Vittoria Shortt

03 May 11:20 PM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • The Northern Advocate e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Northern Advocate
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • The Northern Advocate
  • The New Zealand Herald
  • The Northland Age
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • NZME Digital Performance Marketing
  • Book your classified ad
  • Photo sales
  • © Copyright 2026 NZME Publishing Limited
TOP