Northern Advocate
  • Northern Advocate home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Sport
  • Property
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport
  • Property
    • All Property
    • Residential property listings

Locations

  • Far North
  • Kaitaia
  • Kaikohe
  • Bay of Islands
  • Whangārei
  • Kaipara
  • Mangawhai
  • Dargaville

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Kaitaia
  • Whangārei
  • Dargaville

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In
Advertisement
Advertise with NZME.
Home / Northern Advocate

Major earthworks progressing on SH1/Loop Rd roundabout project

By Kristin Edge
Reporter·Northern Advocate·
16 May, 2019 12:00 AM3 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

The roundabout project at the intersection of Loop Rd and State Highway 1 is scheduled for completion in 2021. Photo/ Supplied

The roundabout project at the intersection of Loop Rd and State Highway 1 is scheduled for completion in 2021. Photo/ Supplied

Major earthworks on a roundabout south of Whangārei are well under way with trees and vegetation removed and plans to reallocate a house.

A team of workers have been on site on State Highway 1 and the intersection of Loop Rd which is a project scheduled for completion in 2021.

House removalists will be on site in June to relocate the house at 518 Sate Highway 1. It is expected two wide loads will be needed to mover the house and once a date was confirmed the public would be notified.

NZ Transport Agency spokesman Darryl Walker said preloading at the corner of Loop Rd and SH1 involved building up the road to above the required level and then allowing it to settle under its own weight.

The same process was happening at the intersection with Portland Rd.Walker said protecting the local waterways meant erosion and sediment controls had been put in place.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

"The controls ensure any water that runs off the construction site doesn't affect the quality of the local waterways. The controls specific to this site are Decanting Earth Bunds, which are the two large 'ponds' in front of our site office."

Protecting local habitats was also key and before any vegetation or trees were removed, a specialist ecologist searched through the vegetation to see if there were any native lizards living in the area.

"This met our conservation and resource management obligations. If lizards were found, they would've been relocated so they're not affected by the work. Within this particular stage of the project, the ecologist didn't find any signs of lizards living in the vegetation."

Advertisement
Advertise with NZME.

Motorists were also encouraged to comply with the speed restrictions posted through the site to ensure the safety of construction workers.

At the end of last month the speed limit on SH1 was reduced to 80km/h between Toetoe Rd and Maungakaramea Rd south of Whāngārei.

The temporary speed limit would remain in place during the construction of the SH1 Loop Road Safety Improvements project, until the project was completed in 2021.

The section of SH1 between Loop Road/SH15 and Portland Rd has a temporary speed limit of 50km/h, which will also remain for the duration of construction.

Discover more

Water restrictions lifted in most of Far North

15 May 08:00 PM

Northland area schools do battle at sports tournament

15 May 10:00 PM
New Zealand

Your weather: Cool southerlies, showers continue into weekend

15 May 06:02 PM

Kareponia residents 'betrayed' by proposed speed limit cut

22 Jul 10:30 PM

Funded through the National Land Transport Fund, the $27 million safety project commenced construction in March.

Walker said these traffic team on site reported drivers were generally observing the speed limits through the site.

"The team thanks motorists and asks that you continue to observe these speed limits to help keep everyone safe and able to return home to whanau, family and friends at the end of the day."

Save

    Share this article

Latest from Northern Advocate

Northern Advocate

New hope: NZ fairy tern population sees promising growth

18 Jun 04:00 AM
Northern Advocate

Iwi leader rules out settlement under this Govt after minister’s sovereignty comments

18 Jun 03:28 AM
Northern Advocate

'Not good enough': Northland doctors walk out over health system crisis

18 Jun 03:06 AM

Jono and Ben brew up a tea-fuelled adventure in Sri Lanka

sponsored
Advertisement
Advertise with NZME.

Latest from Northern Advocate

New hope: NZ fairy tern population sees promising growth

New hope: NZ fairy tern population sees promising growth

18 Jun 04:00 AM

Post-season monitoring recorded 50 individual tara iti, up from 33 last year.

Iwi leader rules out settlement under this Govt after minister’s sovereignty comments

Iwi leader rules out settlement under this Govt after minister’s sovereignty comments

18 Jun 03:28 AM
'Not good enough': Northland doctors walk out over health system crisis

'Not good enough': Northland doctors walk out over health system crisis

18 Jun 03:06 AM
Hopes new Baylys Beach observation tower will aid surf safety, prevent rescues

Hopes new Baylys Beach observation tower will aid surf safety, prevent rescues

18 Jun 03:00 AM
Help for those helping hardest-hit
sponsored

Help for those helping hardest-hit

NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • The Northern Advocate e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Northern Advocate
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • The Northern Advocate
  • The New Zealand Herald
  • The Northland Age
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • © Copyright 2025 NZME Publishing Limited
TOP