Bay of Plenty Times
  • Bay of Plenty Times home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Sport
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport

Locations

  • Coromandel & Hauraki
  • Katikati
  • Tauranga
  • Mount Maunganui
  • Pāpāmoa
  • Te Puke
  • Whakatāne
  • Rotorua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Thames
  • Tauranga
  • Whakatāne
  • Rotorua

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / Bay of Plenty Times

'Tidal' plan to solve bridge bottleneck rejected

WireStream
Bay of Plenty Times·
9 Mar, 2018 11:00 PM4 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save
    Share this article
CONGESTION BUSTER: How a morning peak tidal flow traffic system could work even if the Turret Rd bridge remained two lanes wide. GRAPHIC/MARK WASSUNG

CONGESTION BUSTER: How a morning peak tidal flow traffic system could work even if the Turret Rd bridge remained two lanes wide. GRAPHIC/MARK WASSUNG

An idea to fix one of Tauranga's worst morning rush hour pinch-points has been ruled out by the council's transportation manager, Martin Parkes.

He has poured cold water on a collaboration between Tauranga architect Mark Wassung and the council's transport committee chairman, Rick Curach.

They proposed introducing a tidal flow system across the two-lane Turret Rd bridge. It would have meant holding cars behind traffic lights on the quiet direction of rush hour peaks while both bridge lanes absorbed the main force of traffic.

The median that separates traffic along the middle of Turret Rd would become a temporary third lane in rush hours, with Turret Rd reverting to a two-lane road outside of peak times. There was also room for a third lane on 15th Ave.

Curach said council staff told him that stopping one of the tidal flow lanes every now and then to allow traffic to cross the bridge from the quiet direction would not work.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

Council transportation manager Martin Parkes told the Bay of Plenty Times that traffic modelling had shown that the tidal flow system would make congestion worse, not better.

"It would only work if there were three lanes along Turret Rd. We're doing a feasibility study to assess whether a third lane could be added to the existing Turret Rd bridge."

Parkes said if that was shown to be feasible, the council would then assess whether a tidal flow system would be worthwhile.

Advertisement
Advertise with NZME.

He said widening Turret Rd to four lanes did not have a firm date or budget, but it would not start until after widening and other improvements to 15th Ave had finished. And work on 15th Ave would not start until after the Bayfair to Baypark (Bay Link) project had finished because two main roads could not have major construction taking place at the same time.

A council report last year stated that the Hairini Link underpass, due to open later this year, would not resolve congestion issues on Welcome Bay Rd, or downstream on Turret Rd and 15th Ave.

Curach said three-laning Turret Rd bridge had earlier been ruled out was because it could not sustain the extra loading. "If they come back and say 'Yes you can put three lanes across the bridge', that would be a brilliant interim solution."

However, if the answer was no, then he believed further traffic studies should be carried out on his and Mr Wassung's collaboration. It would mean holding back cars on the quiet peak-time direction until the queue had reached 20 or 30 cars and then allowing them to cross the bridge.

Traffic coming from the busy direction would temporarily be narrowed to one lane.

Advertisement
Advertise with NZME.

A report last week to councillors from council chief executive Garry Poole said the unprecedented increase in cars queuing along Welcome Bay Rd on weekday mornings was a pressing issue.

"The extent of the traffic build-up is a surprise. We have been trying to understand exactly what's going on so that we can hopefully implement some practical solutions."

Poole said the Bay Link project may be the reason why many people who previously used Hewletts Rd now appeared to be using Maungatapu and 15th Ave to reach the city.

The underpass construction was also compounding problems for Welcome Bay residents.

He said traffic data censors were being installed on Welcome Bay Rd and Ohauiti Rd to help understand the change in traffic numbers.

Advertisement
Advertise with NZME.

"We will also be undertaking queue monitoring on Welcome Bay Rd."

A technical working group was meeting this week to see if anything could be done immediately to alleviate traffic pressure. It would also consider measures within the next weeks or months, Poole said.

Save
    Share this article

Latest from Bay of Plenty Times

Sport

Eight-year-old powerlifter smashes world deadlift record with 90kg lift

14 Apr 07:00 AM
Bay of Plenty Times

Cyclone Vaianu Whakatāne evacuations praised as 'well‑founded' after storm

14 Apr 03:00 AM
Bay of Plenty Times

Hobbiton Cup heads to Tauranga for first time

14 Apr 01:00 AM

Sponsored

Sponsored: The deposit myth putting Kiwis off building

24 Mar 04:35 PM
Advertisement
Advertise with NZME.

Latest from Bay of Plenty Times

Eight-year-old powerlifter smashes world deadlift record with 90kg lift
Sport

Eight-year-old powerlifter smashes world deadlift record with 90kg lift

Dad and coach Liam Kane now has him eyeing a 100kg deadlift by November.

14 Apr 07:00 AM
Cyclone Vaianu Whakatāne evacuations praised as 'well‑founded' after storm
Bay of Plenty Times

Cyclone Vaianu Whakatāne evacuations praised as 'well‑founded' after storm

14 Apr 03:00 AM
Hobbiton Cup heads to Tauranga for first time
Bay of Plenty Times

Hobbiton Cup heads to Tauranga for first time

14 Apr 01:00 AM


Sponsored: The deposit myth putting Kiwis off building
Sponsored

Sponsored: The deposit myth putting Kiwis off building

24 Mar 04:35 PM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Bay of Plenty Times e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Bay of Plenty Times
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Bay of Plenty Times
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • NZME Digital Performance Marketing
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2026 NZME Publishing Limited
TOP