Bay of Plenty Times
  • Bay of Plenty Times home
  • Latest news
  • Business
  • Opinion
  • Lifestyle
  • Property
  • Sport
  • Video
  • Death notices
  • Classifieds

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Opinion
  • Lifestyle
  • Property
    • All Property
    • Residential property listings
  • Rural
    • All Rural
    • Dairy farming
    • Sheep & beef farming
    • Horticulture
    • Animal health
    • Rural business
    • Rural life
    • Rural technology
  • Sport

Locations

  • Coromandel & Hauraki
  • Katikati
  • Tauranga
  • Mount Maunganui
  • Pāpāmoa
  • Te Puke
  • Whakatāne
  • Rotorua

Media

  • Video
  • Photo galleries
  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Thames
  • Tauranga
  • Whakatāne
  • Rotorua

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / Bay of Plenty Times

New SH25A bridge taking shape; other Coromandel highways affected by works

Hauraki Coromandel Post
6 Nov, 2023 11:45 PM2 mins to read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  Sign in here

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save

    Share this article

The first stage of bridge deck construction has started over the slip on SH25A in Coromandel. Video / Waka Kotahi NZ Transport Agency

Concrete is set to be poured as work continues at the State Highway 25A Taparahi bridge construction site.

Waka Kotahi New Zealand Transport Agency said the team faced a challenging start to the week with the bad weather, but managed to continue placing the pre-cast deck panels, drill soil nails to stabilise the slip face and complete the earthworks at the eastern approach to the bridge.

“By last Sunday, 70 pre-cast panels had been installed. As the panels are put in place, they are ‘stitched’ together with steel reinforcement and concrete. Our steel fixers have already begun putting in the reinforcement, and the first of three concrete pours is scheduled for early this week.

Top left: Looking west from the new bridge; Top right: The night-shift soil nailing crew at work; Bottom left: Deck panels in place; Bottom right: The eastern approach to the new bridge. Photos / Jenni Austin
Top left: Looking west from the new bridge; Top right: The night-shift soil nailing crew at work; Bottom left: Deck panels in place; Bottom right: The eastern approach to the new bridge. Photos / Jenni Austin

“The first of two new drainage road crossings was completed, and one of the 100T cranes was also demobilised as it is no longer required.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

“This week, weather permitting, the plan is to continue placing the pre-cast deck panels and prepare for the deck stitch concrete pours.

“The team drilling for the soil nails made great progress on the slip face last week, working both day and night shifts.”

The transport agency also provided information on maintenance and recovery works around the Coromandel:

• SH25 Thames: Road resurfacing begins on Sunday, November 12 on SH25, south of the Goldfields shopping centre. The work will take place at night for two weeks. During this time, stop/go traffic management will be in place, and from time to time, side roads will be closed to help finish the work as quickly as possible. The affected side roads include Willoughby Street, Richmond Street and Sealey Street; access for residents will be provided from Pollen Street. Access to Richmond Street West will be maintained at all times.

Advertisement
Advertise with NZME.

• SH26 Puriri: Work to repair the road pavement began on Monday, November 6 south of Kōpū, near Puriri. The work is expected to be completed within two weeks, with stop/go traffic management in place during that time.

• SH26 Murray Road: Asphalt resurfacing began on Sunday, November 5, and is expected to take one week to complete. Stop/go traffic management will be in place between 8pm and 5am each night. Minor delays are expected.

Stay up to date with the HC Post and Waikato Herald

Get the latest Waikato headlines straight to your inbox Monday to Saturday. Register for free today - click here and choose Local News.

Save

    Share this article

Latest from Bay of Plenty Times

Bay of Plenty Times

'Mind-blowing': Chef's two-ingredient meringue breakthrough

Bay of Plenty Times

$1m buyers crazy for Hare Krishna barn with cars in the lounge - 'my busiest open home in three years'

Bay of Plenty Times

'Sustained period of cruelty': Starship doctor slates child protection agency failings


Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

Advertisement
Advertise with NZME.

Latest from Bay of Plenty Times

'Mind-blowing': Chef's two-ingredient meringue breakthrough
Bay of Plenty Times

'Mind-blowing': Chef's two-ingredient meringue breakthrough

'It’s as simple as, and could make life a lot easier.'

15 Jul 06:00 PM
$1m buyers crazy for Hare Krishna barn with cars in the lounge - 'my busiest open home in three years'
Bay of Plenty Times

$1m buyers crazy for Hare Krishna barn with cars in the lounge - 'my busiest open home in three years'

15 Jul 08:10 AM
'Sustained period of cruelty': Starship doctor slates child protection agency failings
Bay of Plenty Times

'Sustained period of cruelty': Starship doctor slates child protection agency failings

15 Jul 06:00 AM


Solar bat monitors uncover secrets of Auckland’s night sky
Sponsored

Solar bat monitors uncover secrets of Auckland’s night sky

06 Jul 09:47 PM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Bay of Plenty Times e-edition
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Bay of Plenty Times
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Bay of Plenty Times
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Rotorua Daily Post
  • Hawke's Bay Today
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • About NZME
  • NZME careers
  • Advertise with NZME
  • Digital self-service advertising
  • Book your classified ad
  • Photo sales
  • NZME Events
  • © Copyright 2025 NZME Publishing Limited
TOP