Harington St Transport Hub. Photo / File
In Tuesday's lead story, mayor Tenby Powell's exasperation concerning the new transport hub (an inherited project) was very evident.
In reading the article there are some questions that need answers.
The issue is the foundations
– they are inadequate and need strengthening. How did this get consented in the first place?
The required remedial work will mean additional costs.
As a Tauranga City Council project, how will additional costs not be borne by ratepayers?
Does the council have a private source of funding for this?
Tauranga ratepayers need answers please.
(Abridged)
Bryan Archer
Tauranga
The Bay of Plenty Times welcomes letters from readers. Please note the following:
• Letters should not exceed 200 words.
• They should be opinion based on facts or current events.
• If possible, please email.
• No noms-de-plume.
• Letters will be published with names and suburb/city.
• Please include full name, address and contact details for our records only.
• Local letter writers given preference.
• Rejected letters are not normally acknowledged.
• Letters may be edited, abridged, or rejected at the Editor's discretion.
• The Editor's decision on publication is final. No correspondence will be entered into.
• Letters may be used in other NZME publications.
Email editor@bayofplentytimes.co.nz