Gisborne Herald
  • Gisborne Herald Home
  • Latest news
  • Business
  • Lifestyle
  • Sport

Subscriptions

  • Herald Premium
  • Viva Premium
  • The Listener
  • BusinessDesk

Sections

  • Latest news
  • On The Up
  • Business
  • Lifestyle
  • Sport

Locations

  • Gisborne
  • Bay of Plenty
  • Hawke's Bay

Media

  • Today's Paper - E-Editions
  • Photo sales
  • Classifieds

Weather

  • Gisborne

NZME Network

  • Advertise with NZME
  • OneRoof
  • Driven Car Guide
  • BusinessDesk
  • Newstalk ZB
  • Sunlive
  • ZM
  • The Hits
  • Coast
  • Radio Hauraki
  • The Alternative Commentary Collective
  • Gold
  • Flava
  • iHeart Radio
  • Hokonui
  • Radio Wanaka
  • iHeartCountry New Zealand
  • Restaurant Hub
  • NZME Events

SubscribeSign In

Advertisement
Advertise with NZME.
Home / Gisborne Herald

Historic building undergoes urgent repairs following Cyclone Gabrielle's devastation

Gisborne Herald
20 Jun, 2023 09:02 AMQuick Read

Subscribe to listen

Access to Herald Premium articles require a Premium subscription. Subscribe now to listen.
Already a subscriber?  

Listening to articles is free for open-access content—explore other articles or learn more about text-to-speech.
‌
Save
    Share this article
Contractors are driving sheet piles weighing one tonne each nine metres into the ground to form a retaining wall at Marina Park where the historic building, housing most recently, the Globe restaurant, is located. Picture by Liam Clayton

Contractors are driving sheet piles weighing one tonne each nine metres into the ground to form a retaining wall at Marina Park where the historic building, housing most recently, the Globe restaurant, is located. Picture by Liam Clayton

The historic building on the corner of Marina Park is having urgent repair work done around it after its front deck and the riverbank were heavily damaged during Cyclone Gabrielle.

Gisborne District Council Journeys infrastructure manager Dave Hadfield said the area around the building would be cordoned off to the public while the work is done, which is expected to take around six weeks, weather permitting.

A wall 54m long made of sheet pile will be installed around the Ormond Road side of the boat ramp.

“Each sheet pile weighs one tonne and will be driven around 9m into the soil to form this wall.

“There will be heavy machinery used to put these in and some tree removal will be necessary.

Advertisement
Advertise with NZME.
Advertisement
Advertise with NZME.

“During Cyclone Gabrielle, Marina Park experienced significant flooding, silt inundation, and a large portion of the river frontage was lost to erosion.

“It has left this site vulnerable to future events.”

Mr Hadfield says as repair work is carried out after Cyclone Gabrielle, it’s important to build back smarter.

Advertisement
Advertise with NZME.

“There has to be a certain level of resilience built in to protect this site, and this building, from future impacts from the weather.”

The historic building on the corner of the Waimata and Taruheru rivers has a category 2 listing with Heritage NZ. It was the former ballroom of Lysnar House, still on Stout Street, before it was detached and moved to its position in 1975.

It has been a variety of restaurants since then starting with The Arnhem, The Marina and more recently The Globe. The building is owned by The Gisborne Marina Development Society and the land is owned by Gisborne District Council.

Mr Hadfield said the work may require traffic management on Ormond Road as the construction team progresses.

“Please follow the direction of our traffic controllers, and expect delays, while sheets are lowered into position.

Advertisement
Advertise with NZME.

“We thank you for your patience while we undertake this crucial work.”

The cost of the project is $300,000 and is funded from an insurance claim.

Save
    Share this article

Latest from Gisborne Herald

Gisborne Herald

Architectural award for major project at Mangapapa School

01 May 09:00 AM
Gisborne Herald

Woman accused of hiding nang after fatal car v bus crash

01 May 02:44 AM
Gisborne Herald

Gisborne News Digest: Kayak clubhouse upgrade, Titirangi fire, SH35 gets retaining wall

01 May 01:50 AM

Sponsored

Endangered bird gets another chance

21 Apr 02:30 AM
Advertisement
Advertise with NZME.

Latest from Gisborne Herald

Architectural award for major project at Mangapapa School
Gisborne Herald

Architectural award for major project at Mangapapa School

DCA Architects of Transformation won a prize for its work at the school.

01 May 09:00 AM
Woman accused of hiding nang after fatal car v bus crash
Gisborne Herald

Woman accused of hiding nang after fatal car v bus crash

01 May 02:44 AM
Gisborne News Digest: Kayak clubhouse upgrade, Titirangi fire, SH35 gets retaining wall
Gisborne Herald

Gisborne News Digest: Kayak clubhouse upgrade, Titirangi fire, SH35 gets retaining wall

01 May 01:50 AM


Endangered bird gets another chance
Sponsored

Endangered bird gets another chance

21 Apr 02:30 AM
NZ Herald
  • About NZ Herald
  • Meet the journalists
  • Newsletters
  • Classifieds
  • Help & support
  • Contact us
  • House rules
  • Privacy Policy
  • Terms of use
  • Competition terms & conditions
  • Our use of AI
Subscriber Services
  • Manage your print subscription
  • Manage your digital subscription
  • Subscribe to Herald Premium
  • Subscribe to the Gisborne Herald
  • Gift a subscription
  • Subscriber FAQs
  • Subscription terms & conditions
  • Promotions and subscriber benefits
NZME Network
  • Gisborne Herald
  • The New Zealand Herald
  • The Northland Age
  • The Northern Advocate
  • Waikato Herald
  • Bay of Plenty Times
  • Rotorua Daily Post
  • Whanganui Chronicle
  • Viva
  • NZ Listener
  • Newstalk ZB
  • BusinessDesk
  • OneRoof
  • Driven Car Guide
  • iHeart Radio
  • Restaurant Hub
NZME
  • NZME Events
  • About NZME
  • NZME careers
  • Advertise with NZME
  • NZME Digital Performance Marketing
  • Photo sales
  • © Copyright 2026 NZME Publishing Limited
TOP